Developments

Grove Mansions

London SW4

The property was extensively refurbished internally including the provision of 2 lifts between 2009 and 2013. The first two phases were carried out between 2009 to 2011 and included the extension at roof level to provide 4 x 2 bedroom penthouses with balconies with 4 x 2 bedroom refurbished flats on the floor below.

 

From 2012 to 2013 as part of the third phase 10 of the 12 existing flats were also refurbished with a total investment of circa £3.5 million for the whole of the three phase project.